| Bye, bye London! |
|
| Written by Wojtek (Voytec) Wacowski | |
| Saturday, 22 September 2007 | |
|
Amistad left her birth in London Docklands in the morning today - after sailing through the locks Captain Stephen Olson must coordinate many factors to ensure a smooth passage down the river Thames, through the Dover Strait , English Channel and across the infamous Biscay Bay. The weather was not cooperating lately resulting with a three day delay in departing London. Today - a short window of opportunity appeared on the weather chart.
English Coastal waters are the area of very strong tidal currents - in some instances the speed of a current may almost match the Amistad's speed under full power. After assessing all the variables Captain Olson predicts reaching the Dover Strait - the narrowest part of the English Channel around 8 p.m. local time. (3 p.m. EDT).
According to recent forecasts and weather observations the wind will still blow straight into Amistad's bow but not with a force able to stop her. In the times like the ship's engineer Barry Antel makes sure that two Caterpillar engines deliver a few hundred mechanical horses pushing the Freedom Schooner closer to her next target - Lisbon.
Barry Antel - Amistad's engineer during Leg 2 of the Atlantic Freedom Tour. Photo ©2007 Wojtek (Voytec) Wacowski
Comments
(0)
This content has been locked. You can no longer post any comment.
|
|
| Last Updated ( Saturday, 22 September 2007 ) |
| < Prev | Next > |
|---|


